High Pressure Tee
Main Material:WP1, WP11, WP12, WP22, WP5, WP9, WP91, 16Mo3, 10CrMo5-5, 13CrMo4-5, 10CrMo9-10 etc.
Main Processing Technology |
Raw material entering factory → Is cut into billet → Flattened to dimension requirement → Heating convex hole → Hot extrusion forming → Heat treatment → Machined groove → Surface treatment → Finished product inspection → Mark protection → Put in stock (Note: There is a pickling and passivation process for stainless steel products before surface treatment) |
||||||||||||||||||
Size |
1/2"-120" |
||||||||||||||||||
Standard |
|
||||||||||||||||||
Wall Thickness |
SCH5, SCH10, SCH20, SCH30, SCHSTD, SCH40, SCH60 SCHXS, SCH80, SCH100, SCH120, SCH140, SCH160, SCHXXS |
||||||||||||||||||
Color |
Black, Yellow, Blue, Red. etc as client requirment. |
||||||||||||||||||
Surface Coating |
Rust-proof oil; Black; Galvanized; Polyethylene Coating; Epoxy Coating, etc |
||||||||||||||||||
Marking |
Marker permanent |
||||||||||||||||||
Package |
Ply-Wooden Case for small size Pallet for big size |
||||||||||||||||||
Certificate |
BV ISO9000,CRN,CE |
||||||||||||||||||
The Third Party Inspection |
BV,SGS,LOIYD,TUV,and other party alloyed by clients |
||||||||||||||||||
Brand |
TSZHONGRAN |
||||||||||||||||||
Min Order |
1PCS |
||||||||||||||||||
Payment Terms |
T/T, 100% LC AT SIGHT, 100% LC 30 OR 60DAYS AFTER BL OF DATE, |
||||||||||||||||||
Delivery Time |
7-30days according to acutal order. |
||||||||||||||||||
Delivery Port |
TIANJIN, QINGDAO,SHANGHAI, NINGBO, SHENZHEN, |
||||||||||||||||||
Delivery Ability |
3000TONS/MONTH |
||||||||||||||||||
Applicating |
Paper-marking, Oil and natural gas pipeline, Boiler and heat exchanger, Smelting,Water conservancy, Electric power, Chemical, Pharmaceuticals etc |
||||||||||||||||||
Main Equipment and Installation |
1:2500T hydraulic press (mainly used for flattening and hot pressing) 2:500T hydraulic press (mainly used for flattening and hot pressing) 3:315T hydraulic press (mainly used for flattening and hot pressing) 4: 2 heating furnaces in coal combustion: effective heating area 7.5 m2 and 2.3 M2 5: 1 oil-fired heating furnace: effective heating area 6.4 M2 6: 1 pipe blanking machine (self-made) 7: Machining equipment: lathe (620-1), two vertical lathes: C5225, one ordinary lathe, C630, two vertical drilling machines, one T6112 8: Heat treatment equipment: 1 trolley type oil-fired heat treatment furnace, 8 M2 trolley type box type resistance furnace RT9-80*1500*60, the highest furnace temperature 1200℃ 9: Sandblasting machine 2 sets: mainly used for surface rust removal of pipe fittings 10: Air compressor: air cooling for heat treatment 11: Liquid Cooling Pool: Used for Tube Cooling (Processing and Heat Treatment) Solid Solution Treatment of Stainless Steel 12: Machining Fixture: 40 sets 13: Welding equipment: 14 sets (processing aids) 14: Various moulds: 120 sets for extrusion forming guarantee |
- Telphone- 0317-6165555 6689999
- E-mail- 798758696@qq.com
- Address- Yanshan County Industrial Park, Cangzhou City, Hebei Province
- Telphone- 0317-6165555 6689999
- E-mail- 798758696@qq.com
- Address- Yanshan County Industrial Park, Cangzhou City, Hebei Province